Environmental Impact Assessment Report
In accordance with Ontario Regulation 697/21, an Environmental Impact Assessment Report for the Project was prepared to document:
The Environmental Impact Assessment Report documented the Preliminary Design phase for the Project which was completed in accordance with Ontario Regulation 697/21 (the Regulation). Adherence to the Regulation ensured the Project was completed responsibly and in consideration of all the previous commitments made in relation to the Project, including those made during the 2002 Study (discussed below) and as part of the conditions of approval issued in 2002.
The Preliminary Design phase of the Bradford Bypass is complete and the Environmental Impact Assessment Report as well as the discipline specific reports prepared during this phase are available below.
In accordance with Section 27 of Ontario Regulation 697/21, the Final Environmental Impact Assessment Report was posted to the Project Website on November 16, 2023:
In accordance with Section 19 of Ontario Regulation 697/21, the Final Environmental Conditions Report was posted to the Project Website on October 27, 2022: