In Fall 2024 design work included development of an initial vegetation removals implementation contract. This work was carried out in late Fall 2024 with environmental protection measures, including erosion and sediment control measures used to protect the environment.
The next phase of implementation included the construction of a Sideroad 10 (County Road 54) temporary detour on the west side of Sideroad 10. Environmental protection measures, temporary lighting, and installation of protection measures for the existing Town of Bradford West Gwillimbury watermain is ongoing. The purpose of constructing this detour is to avoid impacts to local traffic using Sideroad 10 during construction of the new Sideroad 10 bridge to be built as part of the Bradford Bypass West Project.
Detail design of the Bradford Bypass West Project is ongoing and will include a comprehensive Landscape Design for the West section of the Project. The Landscape Design will include mitigation and restoration measures such as noise walls (where applicable and feasible), and areas where reforestation, edge management, compensation plantings and snow drift measures are anticipated to be implemented.
Construction of the remaining components of the Project are anticipated to begin in 2026. A Project Update is available here with further information on design progress and future phases of work, including when landscape restoration and mitigation measures will be implemented.